Almbrücke in Oberösterreich
First prestressed concrete structure of the world with compressive stressing reinforcement
| Client: |
Amt der Oberösterreichischen Landesregierung |
| Activity: |
structural engineering, construction supervision * |
| Value of construction: |
EUR 1.06 Mio. (ATS 14.63 Mio.) |
| Time of construction: |
1977 |
Description:
Erection of a road bridge (bridge class I), first prestressed concrete structure of the world with compressive stressing reinforcement (research project)
|
length
width
heigth |
76.00 m
10.60 m
2.50 m
|
|
* participation Civil Engineering Bureau Prof. Reiffenstuhl
|
|
TOP
|
|
|
Scandic Crown Hotel Vienna
A-1020 Vienna, Handelskai 269
| Client: |
SKANSKA AB
Nordenskiöldsgatan 4
SW-211 02 Malmö
represented by:
PRADO
Grundstücksges.m.b.H.
Alsterufer 34
D-20354 Hamburg |
| Activity: |
structural engineering
tendering
evaluation of tenders
construction supervision |
| Value of construction: |
EUR 2.54 Mio. (ATS 35 Mio.) |
| Time of construction: |
1986 to 1988 |
Description:
Erection of a bridge under full maintenance of the traffic of the Donauufer-railway and of the B12, Handelskai
deep foundation with bearing structures of prefabricated units and cast-in-place decks with transverse prestressing |
|
TOP
|
|

|
Weitmannbrücke over Ybbs
in Waidhofen an der Ybbs
| Client: |
Magistrat der Stadt Waidhofen an der Ybbs |
| Activity: |
structural engineering |
| Value of construction: |
EUR 1.09 Mio. (ATS 15.0 Mio.) |
| Time of construction: |
1990 |
Description:
2-webs-T-beam bridge
spans: 20.00 m + 28.00 m + 20.00 m |
|
TOP
|
|

|
HL-AG Lambach bypass
Underpass Schlinkerleitenstraße
| Client: |
Eisenbahn-Hochleistungsstrecken AG
Vivenotgasse 8-12
A-1120 Vienna |
| Activity: |
structural engineering
tendering
evaluation of tenders |
| Value of construction: |
EUR 2.58 Mio. (ATS 35.5 Mio.) |
| Time of construction: |
1991 to 1993 |
Description:
Underpass of a roadway as "white tube"
with new construction of five bearing structures under full maintenance of the railway working (west-railway) |
|
TOP
|
|

|
HL-AG Lambach bypass
structural alteration Schwaigerbachbrücken
| Client: |
Eisenbahn-Hochleistungsstrecken AG
Vivenotgasse 8-12
A-1120 Vienna |
| Activity: |
structural engineering
tendering
evaluation of tenders |
| Value of construction: |
EUR 1.90 Mio. (ATS 26.2 Mio.) |
| Time of construction: |
1993 to 1994 |
Description:
New construction of two bearing structures under full maintenance of the railway working (west-railway)
structural alteration/reinforcement/heave/turning of an existing bearing structure |
|
TOP
|
|

|
Badhausbrücke,
Niederösterreich
first directly-trafficable High-Performance-Concrete bridge structure in Austria
| Client: |
Municipality Tulln
Nußallee 4
A-3430 Tulln |
| Activity: |
structural engineering
tendering
evaluation of tenders |
| Value of construction: |
EUR 0.15 Mio. (ATS 2.1 Mio.) |
| Time of construction: |
1997 |
Description:
Renewal of a steel and wood bridge by use of abutments and foundation piers
|
|
TOP
|
|
Gerstbachbrücke near Hainfeld, Niederösterreich
| Client: |
Amt der Niederösterreichischen Landesregierung
Abteilung Güterwege
Landhausplatz 1, Haus 12
A-3109 St. Pölten |
| Activity: |
structural engineering |
| Time of construction: |
1999 |
Description:
Renewal of a ferroconcrete bridge (system Visentini, built 1900), directly-trafficable High-Performance-Concrete surface |
|
TOP
|
|
ÖBB Extension S7 - airport railway
Underpass Dreherstraße, Schwechat
| Client: |
Österreichische Bundesbahnen
Elisabethstraße 18
A-1010 Vienna |
| Activity: |
structural engineering
tendering |
| Value of construction: |
EUR 2.91 Mio. (ATS 40.0 Mio.) |
| Time of construction: |
1999 to 2000 |
Description:
Erection of an underpass (Dreherstraße) 560 m in length in form of an retaining wall and a bored pile wall (tied and not tied) and of a railway bridge (l=15.50 m) under full maintenance of railway working of the S7 |
|
TOP
|
|

|
Perschlingbachbrücke in Perschenegg
| Client: |
MABA
Industriestraße 28
A-2601 Sollenau |
| Activity: |
structural engineering
|
| Value of construction: |
EUR 0.07 Mio. (ATS 1.0 Mio.) |
| Time of construction: |
2001 |
Description:
Prefabricated unit bridge with concrete topping of High-Performance-Concrete with directly-trafficable High-Performance-Concrete surface |
|
TOP
|
|
|
ÖBB
Vienna Franz Josephs-railway station - Krems/Donau
Structural Alteration railway station Absdorf/Hippersdorf
Erection of an underground passageway
| Client: |
Österreichische Bundesbahnen
Infrastruktur-Planung & Engineering
Technik
Elisabethstraße 18-20
A-1010 Vienna
|
| Activity: |
submission planning
structural engineering
planning for tendering
|
| Value of construction: |
EUR 900,000.00 (ATS 12.38 Mio.) |
| Time of construciton: |
February 2002 to December 2002 |
Description:
Erection of an underground passageway (width=5.20m/ span=5.60m) with staircases to the railway station building, the station platforms and to the planned Park&Ride parking place. |
|
TOP
|
|

|
A 8 - Innkreis motorway
cut-and-cover tunnel
Winner of the Ingenieurpreis 2002 - A8 Baulos 5, OÖ
| Client: |
ÖSAG
Rotenturmstraße 5-9
A-1010 Vienna
and
STRABAG AG
Dir. 16, Ingenieurtiefbau
Salzburger Straße 323
A-4021 Linz |
| Activity: |
structural engineering |
| Value of construction: |
EUR 28.27 Mio. (ATS 389 Mio.) |
| Time of construction: |
2001 to 2003 |
Description:
Erection of a cut-and-cover tunnel 2,400 m in length as well as a gallery 380 m in length, built as a "white tube" with stages 24 m in length which were concreted in one go (approximately 950 m³)
|
|
TOP
|
|

|
A 9 - Phyrn motorway
cut-and-cover tunnel Ottsdorf
award winner of the ÖAMTC-tunnel-test 2005
| Client: |
Strabag AG
Dir. 16, Ingenieurtiefbau
Salzburger Straße 323
A-4021 Linz |
| Activity: |
structural engineering
|
| Value of construction: |
EUR 30.5 Mio. (ATS 419.7 Mio.) |
| Time of construction: |
November 2002 to May 2004 |
Description:
Erection of a cut-and-cover tunnel 1,940 m in length, built as a "white tube" |
|
TOP
|
|

|
ÖBB railway track section Aspang-Friedberg
Grollergraben-Viaduct
Wiesmath-Viaduct
Habischleiten-Viaduct
| Client: |
Österreichische Bundesbahnen
Fahrweg
Ingenieurwesen/Dienstleistung
Nordbahnstraße 50
A-1020 Vienna
|
| Activity: |
structural engineering
|
| Time of construction: |
2003 |
Description:
Rehabilitation of three viaducts built in the turn of the century. Installation of a carriageway trough and dewatering lines |
|
TOP
|
|

|
Prefabricated High-Performance-Concrete unit bridge structures
with directly-trafficable High-Performance-Concrete surface
| Client: |
Amt der NÖ Landesregierung
Gruppe Straße, Abteilung Landesstraßen
Landhausplatz 1
A-3109 St. Pölten
|
| Activity: |
structural engineering
planning of types
|
| Planning: |
2001 to 2002 |
| Time of construction: |
as of 2003 |
Description:
Elaboration of a type paper for prefabricated unit bridge structures (bridge classI/road width=6.00 m and pavement width=1.25 m) with prefabricated High-Performance-Concrete units and with directly-trafficable High-Performance-Concrete surface (prefabricated units: span=5.00-11.00 m) |
|
TOP
|
|

|
Kreisbachbrücke near Kreisbach,
L 5117.05
| Client: |
Amt der NÖ Landesregierung
NÖ Straßendienst, NÖ Straßenbauabt. 5
Linzer Straße 106
A-3100 St. Pölten
|
| Activity: |
submission planning
planning for tendering
structural engineering
|
| Value of construction: |
EUR 0.15 Mio. (ATS 2.06 Mio.) |
| Time of construction: |
2003 |
Description:
This object is a reference for the type paper "Prefabricated High-Performance-Concrete unit bridge structures with directly-trafficable High-Performance-Concrete surface".
The bearing structure is a simple bridge of three prefabricated High-Performance-Concrete units (each with a width of 2.60 m and with a span of 9.50 m) with directly-trafficable High-Performance-Concrete surface.
At the final condition the three prefabricated units are combined because of the surface and they are seen as gross cross section.
|
|
TOP
|