Austria Center Vienna - ACV
Vienna International Center
A-1223 Vienna, Wagramerstraße 23-29
|
Client: |
Austria Center Vienna
Wagramerstraße 23-29
A-1223 Vienna |
| Activity: |
structural engineering *
- roof bearing structure (structural steelwork)
- hall slabs (composite bearing structure)
- basement storeys (flat slabs) |
| Value of construction: |
EUR 290.7 Mio. (ATS 4.00 Mrd.) |
| Time of construction: |
1982 to 1985 |
Description:
conference centre for 6,000 persons with an assembly room for 4,200 participants
Construction data:
|
building volume
net floor area
building height
14 conference rooms
exhibition area |
500,000 m³
90,000 m²
45 m
9,500 m²
6,500 m² |
|
* project management Civil Engineering Bureau VFK, Vienna |
|
TOP
|
|
|
Scandic Crown Hotel Vienna
A-1020 Vienna, Handelskai 269
|
Client: |
SKANSKA AB
Nordenskiöldsgatan 4
SW-211 02 Malmö
represented by:
PRADO Grundstücksges.m.b.H.
Alsterufer 34
D-20354 Hamburg |
|
Activity: |
structural engineering |
|
Value of construction: |
EUR 25.4 Mio. (ATS 350 Mio.) |
Time of construction: |
1986 to 1988 |
Description:
Structural alteration of an as a historical monument classified garner of Vienna (ferroconcrete construction, built 1912) into a four-star hotel with 375 rooms.
|
|
TOP
|
|
|
The Austrian Federal Economic Chamber -
Extension of parking levels
A-1040 Vienna, Wiedner Hauptstraße 68
|
Client: |
The Austrian Federal Economic Chamber
Wiedner Hauptstraße 68
A-1040 Vienna
and
Fa. Hamberger Bauges.m.b.H.
A-1230 Vienna |
|
Activity: |
structural engineering |
|
Time of construction: |
April 1989 to May 1990 |
Description:
Extension of parking levels with four slabs
(altogether 6,300 m², prestressed flat slabs with no-bond tensioning)
|
|
TOP
|
|

|
SAS Palais Hotel Vienna - Extension
A-1010 Vienna, Parkring 14 and 16
|
Client: |
SAS International Hotels
Rue de Genève 10
B-1000 Brussels
Z-Treuconsult Beteiligungsges.m.b.H. u Co.
Palais Leitenberger Revitalisierungs KG
Obere Donaustraße 19/1
A-1020 Vienna |
| Activity: |
project management
structural engineering
tendering
construction supervision |
| Value of management: |
|
Parkring 16: |
EUR 35.32 Mio. (ATS 486 Mio.) |
| Parkring 14: |
EUR 4.36 Mio. (ATS 60 Mio.) |
|
Value of construction: |
| Parkring 16: |
EUR 26.16 Mio. (ATS 360 Mio.) |
| Parkring 14: |
EUR 4.36 Mio. (ATS 60 Mio.) |
| Time of construction: |
February 1992 to December 1993 |
|
and |
|
February 1991 to September 1991 |
Description:
Revitalisation of Palais Leitenberger, structural alteration of an as a historical monument classified palais of the late historism (built 1871 to 1873) into a five-star hotel with 225 rooms, while maintaining the hotel operations in Parkring 14.
|
|
TOP
|
|
|
STEG-administration building
A-8010 Graz, Adlerstraße
|
Client: |
Ingenieurbüro Dr. Altenburger
A-8010 Graz |
| Activity: |
structural engineering |
| Value of construction: |
EUR 9.24 Mio. (ATS 130 Mio.) |
| Time of construction: |
1993 to 1995 |
Description:
Construction of an administration building for an energy supply company. |
|
TOP
|
|
|
Austrian Red Cross-Rescue Center Tulln
A-3430 Tulln an der Donau, Franz Zant-Allee 3-5
|
Client: |
Austrian Red Cross-Niederösterreich
Franz Zant-Allee 3-5
A-3430 Tulln an der Donau |
| Activity: |
structural engineering |
| Value of construction: |
EUR 7.27 Mio. (ATS 100 Mio.) |
| Time of construction: |
1991 to 1993 |
Description:
Erection of a rescue center with training facilities |
|
TOP
|
|
|
Ägidigasse - dwelling house
A-1060 Vienna, Ägidigasse 7-11
|
Client: |
Freude am Wohnen
Wohnbauges.m.b.H.
Anzengruberstraße 3/3
A-4020 Linz |
|
Activity: |
structural engineering |
| Value of construction: |
EUR 5.23 Mio. (ATS 72 Mio.) |
| Time of construction: |
1996 to 1997 |
Description:
New building of a dwelling house (92 flats) with underground car park in the city centre
|
|
TOP
|
|
|
Donaucity-church
A-1220 Vienna, Kaisermühlen
|
Client: |
planning department of the archbishopric Vienna
Wollzeile 2
A-1010 Vienna |
|
Activityt: |
structural engineering |
Value of construction:
(carcass) |
EUR 1.60 Mio. (ATS 22 Mio.) |
|
Time of construction: |
1999 |
Description:
New building of Donaucity-church, cross-shaped roof bearing structure as a prestressed concrete structure with no-bond tensioning
|
|
TOP
|
|

|
St. Stephan´s Cathedral Vienna
Restoration of a giant pinnacle
|
Client: |
planning department of the archbishopric Vienna
Wollzeile 2
A-1010 Vienna |
|
Activity: |
structural engineering |
|
Time of construction: |
May 1998 to September 1998 |
Description:
Suspension of a pinnacle 11.5 m in height and 30 to in weight with an auxiliary construction at the main spire during the restoration of a giant pinnacle; creation of an undisturbed workroom for restoration works under the suspended pinnacle and with essential reduction of the construction time
|
|
TOP
|
|

|
Wiener Stadthalle
Underground car park Märzpark
|
Client: |
Wiener Stadthalle Betriebs- und Veranstaltungsges.m.b.H.
Vogelweidplatz
A-1140 Vienna |
|
Activity: |
submission planning |
Description:
Erection of an underground car park at the Hütteldorferstraße and Märzpark with three slabs and 778 parking places as well as entrances and surface-structuring
|
|
TOP
|
|

|
Judenplatz Memorial
A-1010 Vienna
|
Client: |
Dr. Karlheinz Wagner & Co ZT KEG
Schottenfeldgasse 78/1/DG
A-1070 Vienna |
|
Activity: |
structural engineering
consultation |
|
Time of construction: |
1998 to 1999 |
Description:
foundation slab, prestressed concrete structure with no-bond tensioning
|
|
TOP
|
|
|
Vienna Museum of Technology
Structural Alteration and Move of a Depot, Object 5
A-1140 Vienna, Braillegasse
|
Client: |
BUWOG
Bauen und Wohnen Ges.m.b.H.
Hietzinger Kai 131
A-1130 Vienna
|
|
Activity: |
planning
construction supervision
structural engineering
main project management |
|
Value of construction: |
EUR 0.94 Mio. (ATS 13.00 Mio.) |
|
Time of construction: |
1999 to 2001 |
Description:
Structural alteration, renewal of fire protection and move of the exhibition objects
|
|
TOP
|
|
|
Revitalisation Palais Coburg, Wien
A-1010 Vienna, Seilerstätte 1
|
Client: |
POK Pühringer Privatstiftung
Kärntner Ring 5-7, Top 8
A-1010 Vienna |
| Activity: |
structural engineering
building physics
proof engineer |
| Value of construction: |
EUR 50 Mio. (ATS 688 Mio.) |
| Time of construction: |
May 2000 to October 2002 |
Description:
Revitalisation of Palais Coburg (classified as a historical monument) with erection of concert rooms, restaurants and cafés, flats, office areas and trading floor areas as well as a mechanical underground car park with 80 parking places |
|
TOP
|
|
|
Vienna Museum of Technology
Structural Alteration Objekt 1
A-1140 Vienna, Braillegasse
|
Client: |
BUWOG
Bauen und Wohnen Ges.m.b.H.
Hietzinger Kai 131
A-1130 Vienna
|
|
Activity: |
project control
general planning
construction supervision
|
|
Value of construction: |
EUR 1.45 Mio. (ATS 20.00 Mio.) |
|
Time of construction: |
2000 to 2003 |
Description:
Change of use of the Carl Zeiss factory (built in 1916) from an industrial construction to a depot for the Vienna Museum of Technology while considering the classification of a historical monument.
Structural alteration and renewal of the fire protection |
|
TOP
|
|
|
Wiener Stadthalle
Underground car park Märzpark
|
Client: |
ARGE VOITL-SEDLAK
Dipl.-Ing. Wilhelm Sedlak Ges.m.b.H.
Quellenstraße 163
A-1100 Vienna
|
|
Activity: |
planning of the open cut bracing
technical consultation
|
|
Value of construction: |
EUR 9.81 Mio. (ATS 135.00 Mio.) |
|
Time of construction: |
September 2002 to December 2003 |
Description:
Erection of an underground car park at the Hütteldorferstraße and Märzpark with three slabs and 778 parking places as well as entrances and surface-structuring |
|
TOP
|
|
|
Armonia - pharmacy
Vienna
|
Client: |
Mag.pharm. Franz Karner
Vollbadgasse 1A
A-1170 Vienna
|
|
Activity: |
structural engineering
test engineer according to the building regulations for Vienna |
|
Value of construction: |
EUR 1.8 Mio. (ATS 24.8 Mio.) |
|
Time of construction: |
June 2003 to December 2003 |
Description:
Structural alteration of an existing pharmacy and heightening of one storey for a health center.
The ground floor will be completely erected with cellar as storage room for medicaments and a roboter for medicaments will be installed. |
|
| TOP
|